TY - BOOK ED - Sociedad Minera Salar de Atacama Ltda. ED - Hydrotechnica. TI - Salar de Atacama Phase 3B Hydrological Investigations U1 - 553.499 H995 1988 21 PY - 1988/// PB - Hydrotechnica Ltd. KW - Salar de Atacama N1 - The prime objective of Phase 3B, was to bring the investigation to such a stage that an outline production wellfield design could be produced, including location, construction detail and numbers of boreholes pipelines, pumping rates power requirements ancillary works necessary ER -