000 00809nam a22001937a 4500
999 _c5283
_d5283
003 CL-SaCFP
005 20201128062548.0
008 151113b xxu||||| |||| 00| 0 eng d
040 _cCL
082 _a553.499 H995 1988
_221
110 _96724
_aSociedad Minera Salar de Atacama Ltda.
245 _aSalar de Atacama Phase 3B Hydrological Investigations.
260 _bHydrotechnica Ltd.
_c1988
300 _a3 tomos.
500 _aThe prime objective of Phase 3B, was to bring the investigation to such a stage that an outline production wellfield design could be produced, including location, construction detail and numbers of boreholes pipelines, pumping rates power requirements ancillary works necessary.
650 0 _aSalar de Atacama.
_96208
710 _aHydrotechnica.
_95384
942 _2ddc
_cMN