245 | _aSalar de Atacama Phase 3B. Modelling and wellfield design additional base cases. | ||
260 |
_bHydrotechnica Ltd. _c1988 |
||
300 | _a94 páginas | ||
500 | _aThe prime objective of Phase 3B, was to bring the investigation to such a stage that an outline production wellfield design could be produced, including location, construction detail and numbers of boreholes pipelines, pumping rates power requirements ancillary works necessary. | ||